Structural Installation for Petrofac E&C Sdn Bhd
Structural installation of EPCC of the Amine Recovery Units (ARU), Sulphur Recovery Units (SRU), Sour Water Stripping (SWS), Liquid Sulphur Storage Unit (LSSU) And Sulphur Solidification Units (SSU) For Rapid Project at Sub-Directory 1, Package No 4 – Pengerang In Johor, Malaysia.
Services includes:
- Heavy equipment erection
Major work:
- Installation of Prefabricated structure 7880 Ton
Targetted completion:
August, 2013.
-
malaysia
JOHOR